Durable Greenhouse Photovoltaic Bracket for Solar Panel Installation

Still deciding? Get samples of $ !
Request Sample

Product Description

📋
Basic Information
Model NO.
WL-1-E027
Certification
GB, ISO, TUV, SGS
Application
Commercial
Material
Aluminum Alloy
Type
Carport Brackets
Wind Load
30-60m/S
Tilt Angle
0-60
Foundation
Concrete/Ground Screw
Production Capacity
3.6gw/Year
🛠️
Product Description
Photovoltaic Bracket
Solar Panel Installation Bracket
MaterialSteel / Aluminum / Stainless steel SampleAvailable
FinishingHot-dip galvanized / zinc-aluminum-magnesium Transport PackageEPE foam / Fumigation wooden box / Trag
SpecificationCustomizable Delivery Time5-30 Days
📝
Quotation Requirements

To provide an accurate quotation, please confirm the following:

  • Project location (Wind & Snow load specifications)
  • Project type (Ground, Rooftop, Carport, etc.)
  • Structure type (Fixed, Tracking, or Adjustable)
  • Required Standards (EN, ASTM, ST, GB, etc.)
  • Target delivery timeframe
📐
Product Information
Bracket Detail 1
Bracket Detail 2
Coating Hot-dip galvanized / zinc-aluminum-magnesium
C Type Steel (mm) U Type Steel (mm) Standard Package
80*40*20*2.0 to 160*60*20*3.0 41*21 to 41*82 Standard Export Sea-Worthy Packing
🏢
Manufacturing Capability
Manufacturing Facility
  • Scale: 46,000 sqm total area with 35,000 sqm constructed facility.
  • Core Goals: Low-carbon, sustainable development, and new energy-industry integration.
  • Operations: Linking energy conservation and steel value chains via global tech channels.
  • Objective: Sustaining technological leadership in solar mounting solutions.
⚙️
Production Process
Production Process Flow
🌍
Global Project Examples
Chongqing Project
200MWp PV Project in Chongqing
Israel Project
6MW Floating PV Project in Israel
Vietnam Project
50MW PV Power Station in Vietnam
Xinjiang Project
600MW PV Generation in Xinjiang
Lvyuan Project
30MW PV Project in Shenmu
Henan Project
150MW Agrivoltaic Project in Henan
🏆
Certifications & Partners
Certificates Part 1 Certificates Part 2 Cooperation Partners
Frequently Asked Questions
Are you a manufacturer?
Yes, we are a professional manufacturer with our own dedicated production facility.
Can we visit your production facility?
You are warmly welcome to visit. Once you provide your schedule, we can arrange for a pickup and facility tour.
Do you have quality control certifications?
Yes, our products and processes have gained CE and ISO authentications to ensure high quality standards.
How long is your standard delivery time?
Generally, it is 7-14 days if the goods are in stock. For custom orders or non-stock items, it ranges from 15-30 days depending on the quantity.
Can we request product samples?
Yes, we provide available samples from our stock. Samples are free, but customers are required to cover the freight costs.
Can you manage international shipment logistics?
Absolutely. We work with permanent freight forwarders who provide competitive pricing and professional shipping services globally.

Related Products