Universal Aluminum Roof Rack for SUV/Truck Car Roof Rack

Still deciding? Get samples of $ !
Request Sample

Product Description

🟧 OVERVIEW
Material:
Aluminum Alloy
Opening:
Dual Side
Load Capacity:
31-40kg
Capacity:
400-500L
Car Roof Rack Type:
Single Deck
Color:
Silver Grey
Certification:
GS, ISO9001, CE
Finish:
Anodized, Powder Coating, etc
Aluminum Roof Rack
Roof Rack Details
🟧 PRODUCT DESCRIPTION
Product Range: Everything about aluminum—Best price, high quality, and professional service.
Finished Products: Aluminum doors, windows, roof lanterns, curtain walls, and luggage racks.
Technical Specs: Alloys 6063, 6061, 6082 in T5/T6 tempers.
Aluminum Extrusion
Roof Rack Components
Production Process
Alloy Temper Standard Certification Surface Finish
6063, 6061, 6060, 6005, 6082 T5, T6, T4 DIN, AAMA, AS, China GB ISO9001:2008 Anodized, Powder coated, Wood Grain, Electrophoresis, Polished, Brushed
Aluminum Finish
Manufacturing Line
🟧 MANUFACTURING STRENGTH
Extrusion Lines: 44 sets imported from Japan and Italy with an annual capacity of 400,000 tons.
Surface Treatment: 5 horizontal and 1 vertical anodizing lines; liquid and powder coating lines from USA/Italy.
Precision Machining: CNC machining centers with accuracy up to 0.005-0.001mm.
Quality Supervision: Complete testing equipment from raw material to finished product, CNAS and ISO/IEC17025 certified.
Quality Control
Testing Base
Certification
🟧 CERTIFICATIONS
Industrial Certificates
🟧 FREQUENTLY ASKED QUESTIONS
Q1: What is the standard thickness for anodizing? Can you do 25um?
A: Our normal thickness is about 10 um. Yes, we can provide 25um thickness upon request.
Q2: What colors are available for powder coating?
A: We can produce any color for powder coating as long as a color sample or RAL code is provided. Normal thickness is 60-80um.
Q3: How is the weather resistance for the wood grain finish?
A: Our wood grain finish (D1010) uses Akzo Nobel powder and Italian Menphis film. It complies with AAMA 2603 standards and includes a 10-year color guarantee for normal weather conditions.
Q4: What is the lead time for samples and mass production?
A: New molds and samples usually take 2-3 weeks. Mass production typically requires 3-4 weeks after deposit and order confirmation.
Q5: What certifications and quality standards do your products follow?
A: We are ISO certified. Our manufacturing standards follow DIN, AAMA, AS/NZS, and China GB requirements to ensure international quality.
Q6: What are your primary payment terms?
A: We usually accept T/T with a 30% deposit, and the remaining balance paid before shipment. Other methods like L/C can also be discussed.
Loading
Shipping

Related Products